Provo Municipal Airport Improvements and Expansion
Layton Construction
2022 UC&D Most Outstanding Mass Transit/Airport Project
2022 AGC Utah Project of the Year Airport/Transit
Provo City’s two-story passenger terminal opened in 2022 with four commercial gates and room to expand to ten. The City reported 75,000 square feet at opening. Surface parking and curbside drop-off led to ground-floor ticketing, TSA screening, and baggage handling. Travelers Commons seated 630, with business seating, an enclosed family play lounge, and a nearby pet relief area. Brick storefronts inspired by downtown Provo lined the shops and dining areas. Visitors could watch aircraft from Outlook Lounge or greet arriving passengers through Reunion Court’s floor-to-ceiling glass. Arrivals also had access to two baggage carousels and rental car counters. Airport administration, airline staff, and TSA occupied the upper floor. Reaveley designed concrete foundations over stone-column ground improvement, steel seismic moment frames, composite floor framing, open-web roof joists, and supports for the terminal’s glazing, brickwork, and canopies.


